School Case Study

Case Study: Fire Door Replacement – Central Manchester SchoolProject Overview Fire Blocked 365 were appointed to carry out essential fire door replacement works at a primary school located in Central Manchester. Following a routine inspection and fire risk assessment, several existing doors were identified as non-compliant with current fire safety standards, requiring urgent attention to ensure the safety of staff, pupils, and visitors. Our Approach As a BM TRADA-accredited company, Fire Blocked 365 carried out a full site survey to assess all affected areas and determine the most efficient and compliant solution. Working closely with the school’s facilities management team, we implemented a phased installation plan designed to minimise disruption during teaching hours. Each new door set was selected and fitted in accordance with current fire resistance and hardware regulations, ensuring long-term durability and ease of maintenance. Scope of Works Replacement of multiple FD30 and FD60 fire door sets, including frames, seals, and ironmongery. Upgrading corridor and classroom doors to meet compartmentation requirements. Installation of compliant vision panels, intumescent strips, and smoke seals. Full BM TRADA certification and documentation provided upon completion. Key Results & Benefits Full compliance achieved with current fire safety standards. Improved fire resistance and containment, enhancing safety for all building users. Minimal disruption to the school’s daily operations. Long-term asset protection through quality materials and certified installation. Client Feedback The school’s management team praised the professionalism of the Fire Blocked 365 team for completing the works efficiently, safely, and to a high standard — ensuring the building now meets all legal fire safety requirements. The school’s management team praised the professionalism of the Fire Blocked 365 team for completing the works efficiently, safely, and to a high standard — ensuring the building now meets all legal fire safety requirements.
Arlington House

Case Study: Fire Risk Assessment & Strategy – Listed Building, Manchester City CentreProject Overview Fire Blocked 365 were engaged to support a client responsible for the management of a listed building located in the heart of Manchester City Centre. Due to the building’s age, heritage status, and complex layout, the client sought guidance on fire compliance while aiming to preserve the building’s architectural integrity and control costs. Our Approach Working in collaboration with a qualified fire risk assessor, our team conducted a comprehensive fire risk assessment and subsequently developed a fire strategy tailored specifically to the building’s use, structure, and occupancy. This detailed approach allowed us to assess the true level of fire compartmentation required and the necessity for replacement or upgrading of fire doors across various zones. Key Findings Through a combination of on-site inspections, risk analysis, and alignment with current regulations, the strategy identified that: Certain areas of the building did not require compartmentation as initially assumed. Several existing door sets were suitable for retention, avoiding unnecessary replacement. A performance-based fire strategy provided a compliant and proportionate solution that protected both life safety and the building’s historic character. Outcome & Benefits By taking a strategy-led approach rather than defaulting to full compartmentation works, Fire Blocked 365 were able to deliver significant value to the client: Reduced project cost by avoiding unnecessary fire door installations and compartmentation works. Minimised disruption to the building’s operations and occupants. Preserved listed features and the architectural integrity of the property. Achieved full compliance with fire safety regulations through an evidence-based, documented fire strategy. Client Impact The collaborative process not only ensured regulatory compliance but also provided the client with peace of mind and a clear, documented pathway for ongoing maintenance and inspection – a cost-effective and practical solution for a complex heritage building.